Welcome back, Engineer Ahmed (Operations)
Active Work Orders
14 3 Critical
PM Compliance
94.2% +1.8%
Operational Assets
1,204 98.5%
Low Inventory Parts
5 Reorder
Maintenance SLA & Work Order Performance
Completed Work Orders : 934
Next 3 Days Schedules
4 PM Tasks DuePM-2004: Emergency Generator Load Test
Generator GEN-02Due: 17 Jun, 2026
PM-2003: Fire Pump Run Test
Fire Pump FP-01Due: 18 Jun, 2026
PM-2002: Elevator Safety Inspection
Elevator A - Building BDue: 20 Jun, 2026
PM-2001: HVAC Filter Replacement
AC Unit 01 - Building ADue: 01 Jul, 2026
SLA Compliance
System SLA Performance
Target SLA : 95.0%
Global Facility Sites Status
Low Stock Alerts
5 ItemsAir Filters HVAC
Threshold: 20 unitsSafety Low
LED Bulbs 12W
Threshold: 50 unitsSafety Low
Water Valve 1/2"
Threshold: 10 unitsSafety Low
Hydraulic Oil Ltr
Threshold: 15 unitsSafety Low
Fuses 15A
Threshold: 100 unitsSafety Low
Recent Critical Work Orders
|
|
WO ID | Title | Type | Priority | Status | Location | Assigned To | Created Date | Action |
|---|---|---|---|---|---|---|---|---|---|
|
|
#WO-1001 | Repair leaking pipe in Lobby | Corrective | Critical | In Progress | Main HQ - Ground Floor | 15 Jun, 2026 | ||
|
|
#WO-1003 | Generator monthly load test | Preventive | High | Pending | Power House - Basement | 16 Jun, 2026 | ||
|
|
#WO-1004 | Server room AC cooling failure | Corrective | Critical | In Progress | IT Center - Room 302 | 16 Jun, 2026 | ||
|
|
#WO-1005 | Replace broken window panel | Corrective | Low | Completed | Annex B - Second Floor | 14 Jun, 2026 | ||
|
|
#WO-1006 | Fire alarm panel annual test | Safety | High | Completed | Whole Facility | 12 Jun, 2026 |