Create PM Schedule

Schedule Identification

Schedule name must be at least 10 characters.
Please select a PM type.
Please select the priority for generated work orders.

Asset Link & Location Scope

At least one active asset must be linked to the schedule.
Asset ID & Name Category Facility Location
No assets selected. Please select at least one asset above.

Trigger & Frequency

First occurrence date cannot be in the past.
End date must be after the first occurrence date.
Occurrences must be at least 1.

Every Months
Please set a valid frequency and interval.
Please select a meter type.
Hours
Meter threshold must be a positive number.
Please describe the condition trigger.

Task & Checklist Details

Task description must be at least 30 characters.
Up to 50 items per schedule.
Duration must be between 0.01 and 24 hours.

Assignment & Notifications

Advance notice must be between 1 and 90 days.

Spare Parts & Cost Estimates

Spare Part Required Qty Action
EGP
Auto-calculated from parts and labor estimate, but editable.
Estimated cost must be a positive number.