Welcome back, Engineer Ahmed (Operations)

Active Work Orders

14 3 Critical

PM Compliance

94.2% +1.8%

Operational Assets

1,204 98.5%

Low Inventory Parts

5 Reorder

Maintenance SLA & Work Order Performance

Completed Work Orders : 934

Next 3 Days Schedules
4 PM Tasks Due
PM-2004: Emergency Generator Load Test
Generator GEN-02
Tomorrow

Due: 17 Jun, 2026

PM-2003: Fire Pump Run Test
Fire Pump FP-01
In 2 Days

Due: 18 Jun, 2026

PM-2002: Elevator Safety Inspection
Elevator A - Building B
In 4 Days

Due: 20 Jun, 2026

PM-2001: HVAC Filter Replacement
AC Unit 01 - Building A
Active

Due: 01 Jul, 2026

92.4%

Overall System Health (OEE)

85

Active PMs

14

Urgent WOs

Space Utilization

82% Occupied

Target: 80%

PM Compliance

94.2%

Target: 95%

SLA Compliance

System SLA Performance

Target SLA : 95.0%

Global Facility Sites Status

Canada Site

|

98.5%

USA Site

|

97.8%

Russia Site

|

96.5%

China Site

|

95.0%

Brazil Site

|

94.2%

Low Stock Alerts

5 Items
Air Filters HVAC
Threshold: 20 units
12 units

Safety Low

LED Bulbs 12W
Threshold: 50 units
30 units

Safety Low

Water Valve 1/2"
Threshold: 10 units
3 units

Safety Low

Hydraulic Oil Ltr
Threshold: 15 units
8 units

Safety Low

Fuses 15A
Threshold: 100 units
45 units

Safety Low

Recent Critical Work Orders

WO ID Title Type Priority Status Location Assigned To Created Date Action
#WO-1001 Repair leaking pipe in Lobby Corrective Critical In Progress Main HQ - Ground Floor ... Ahmed Ali 15 Jun, 2026
#WO-1003 Generator monthly load test Preventive High Pending Power House - Basement ... Sarah Al-Otaibi 16 Jun, 2026
#WO-1004 Server room AC cooling failure Corrective Critical In Progress IT Center - Room 302 ... John Doe 16 Jun, 2026
#WO-1005 Replace broken window panel Corrective Low Completed Annex B - Second Floor ... Ahmed Ali 14 Jun, 2026
#WO-1006 Fire alarm panel annual test Safety High Completed Whole Facility ... Safety Team 12 Jun, 2026